Bulky Waste Shredding Facility
The bulky waste shredding facility reduces oversized waste (furniture, wood, mixed construction debris, bulky packaging, etc.) to a size suitable for downstream sorting or disposal. Shredding first cuts waste volume, improving both transport and the efficiency of the sorting equipment that follows.
Highlights
- Work-Safety Compliant
- Low Maintenance Cost
- High Torque Capacity
- High Wear Resistance
From intake to bale
Process steps
- 01
Reception and Pre-Sorting
Bulky waste is received at the facility; foreign matter unsuitable for shredding is picked out by hand.
- 02
Primary Shredding
Waste passes through a slow-speed, high-torque shredder that reduces it to smaller pieces.
- 03
Metal Separation
Ferrous metals are removed from the shredded material with a magnetic separator.
- 04
Dispatch
Size-reduced waste is dispatched to the relevant recovery or disposal facility.
Main equipment
The machines used in this plant, in line order.
Technical catalogue
We'll send this plant's catalogue by email.



